top of page
Northamptonshire, UK // Industrial Excellence
Midlands Logistics Hub
A logistics facility requiring a heavy-duty surfacing system to meet the rigorous demands of national distribution. We implemented a technical polyurethane resin solution, delivering a seamless, high-traffic environment with exceptional load-bearing capacity and architectural clarity.
Project Highlights
12,000 sqm
Seamless Poured
14-Day
Turnover Window
HD-Load
HD3-Grade Finish
Chemical
PU Resistance
Element Didn’t Load
Due to a technical issue, we were unable to load this element.
Check your internet and refresh this page.
Specification
System
Industrial Resin
Finish
High-Gloss
Area
8,200 sqm
Installation Time
14 Days
Colour / RAL
RAL 5002 Blue / 9003 White
Thickness
4mm
Substrate
Reinforced Concrete
Performance
Heavy Duty
Scale your facility with technical precision
Request a professional consultation for industrial-grade flooring solutions specifically engineered for the Midlands Logistics Hub.
bottom of page